2. Juzo building II
In the year 2000 Juzo integrated as single manufacturer in this sector the refinement of the raw material into the own production flow and founded a new building for this process. The building II is containing 3000 qm of production area and more than 1000 qm of stock area in which the spooling department and the refining department are placed.
A balanced climate in the production hall is absolutely necessary because of quality reasons. The air conditioning which has been made especially for this production process is guaranteeing that. It can exchange up to 300000 cbm per hour.
[>] continue with spooling/rewinding
|